TYPES OF MAPS AND PHOTOMAPS FOR THEATER OF OPERATIONS (Continued): 1 Road maps Aero naut ical charts, sec tional Aero naut ical charts, region al 2 Miscellaneous 1:500,000 (1 inch= 8 miles) 1:1,000,000 (1 inch= 16 miles) 3 Eleva tions shown by color gradi ents Eleva tions shown by color gradi ents I Varies Varies Varies 6 Varies Varies Varies 6 Logistics. Concentra tion of mechanized units. Maintenance and operation of communication Aerial navigation and as strategical map substitute Aerial navigation and as strategical map substitute 7 Drainage systems, water, etc. Stream lines and ground forms Railroads, roads, towns, air fields, and aids to aerial navigation Stream lines and ground forms Railroads, roads, towns, air fields, and aids to aerial navigation 8 Civilian agencies © Coast and Geo detic Survey, U.S. Hydro- graphic Office© Corps of Engineers © Coast and Geo detic Survey, U.S. Hydro- graphic Office© Corps of Engineers © 9 American Automobile Association, oil companies, etc. © Coast and Geo detic Survey, U.S. Hydro- graphic Office Corps of Engineers Coast and Geo detic Survey, U.S. Hydro- graphic Office Corps of Engineers 10 Limited quantities on M-day. Reproductions: 24 to 48 hours Limited quantities for U.S. on M-day. Reproductions: 24 to 48 hours Limited quantities for U.S. on M-day. Reproductions: 24 to 48 hours OJ NOTES © The data as to existing maps contained in this table concern primarily the continental United States. Appropriate modifications are neces sary in order to conform to conditions in other theaters of operations. ® Time estimates are predicated upon adequately organized, equipped, and trained mapping (Air Corps, Engineer) and reproduction (Engi neer) troops. Under less favorable conditions more delay must be expected. ® Under most favorable conditions, a single wet-print can be dropped within 30 minutes after photography, when the rapid type of photog- graphy is used, in which case no negative is available. © 5,000-yard grid lines overprinted, or shown by tick marks at edge of map.

Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.

Original scan

Loading the original scan…
Original scan, PDF page 249. Only this page is downloaded. Open the full PDF

FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data, PDF page 249

100%

Data on this page

5 data points

AttributeValue
road maps (theater)
scale1:500,000“s, region al 2 Miscellaneous 1:500,000 (1 inch= 8 miles) 1:1,000,0”
aeronautical charts, regional
scale1:1,000,000“1:500,000 (1 inch= 8 miles) 1:1,000,000 (1 inch= 16 miles) 3 Eleva”
map notes: grid overprint
grid line spacing5,000 yards“© 5,000-yard grid lines overprinted, or shown by tick marks at edge of”
map reproduction time (road maps, aeronautical charts)
reproduction time24 to 48 hours“Reproductions: 24 to 48 hours”
rapid-type photography wet print
time to drop single wet-print after photography (most favourable)30 minutes“within 30 minutes after photography, when the rapid type of photog-”