194-195 FIELD ENGINEERING DATA
c. Fixed bridges.—
Normal span
Width of roadway
Capacity
Portable
steel
bridge,
H-10
capacity
72ft
One-track
H-10&
Portable
steel bridge, H-20 capacity
125ft
One-track
H-20c
H-15 Timber trestle bridge
15 feet-25 ft per bay, bays
required.
a
as
One-track
15-tons
Where stocked Corps and army engineer supply points
Time to construct d 1-2 hours 4-8 hours 1-5 hours per bay
NOTES
a Bridges built for H-15 loads will carry any corps load or the tank, light (26,000-
30,000 pounds). If time and materials are lacking, an H-10 timber trestle bridge can
be built using fewer stringers and omitting one layer of flooring.
6 Portable Steel bridge H-10 capacity will carry all organic infantry and cavalry
division loads. It will carry any vehicle with a gross weight of not over 10 tons. It
will also carry the tank, light (26,000-30,000 pounds) for spans of not over 48 feet.
c Portable Steel bridge, H-20 capacity will carry any corps load and any Armored or Motorized Division load to include the 30-ton medium tank.
d Exclusive of approaches; well trained troops.
• 195. WATER SUPPLY.—a. Troop requirements.— Average requirements©
for water by troops under several conditions of service, expressed in gallons
per unit (man, animal, vehicle) per day:
Men. . .....
AfilTrmls
In
battle
1A -2©3 -5©M-i
March
and
bivouac
2
10i/_i
Temporary
camp
5
10M-l
Semipermanent
camp
in rest area
30
30M-30
Cantonment
50
50M-50
NOTES
© Modify according to circumstances, especially in hot climates. Maximum requirement may
exceed the average by from 15 to 100 per cent.
© J/2 gallon per man and 3 gallons per animal is the absolute minimum, for not more than three days.