Skip to content
WW2 Information

Searchsoon

FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data (1941), p. 286

Page 286 of 363 in FM 101-10

Transcription

FIELD ENGINEERING DATA 197 Digging foxholes (pits for individuals). Digging shallow emplacements for automatic weapons. Removing small obstructions to improve the field of fire of indi vidual weapons. Establishing temporary command and observation posts. Camouflage of installations and suppression of signs of occupa tion. (2) Hasty fortifications (to be completed in approximately six hours): Machine gun, mortar, and antitank gun emplacements. Improvement of fields of fire. Squad trenches, simple standing type, or slit trenches, in platoon positions on main line of resistance (developed by connecting individual foxholes) Continuous obstacle in front of main line of resistance, based if possible on a natural barrier, to include antitank mine fields, tank obstacles, and road blocks. Shallow connecting trenches between squad or slit trenches in platoon positions. Improvement of temporary command posts, observation posts, and aid stations. Provisions for camouflage, in all tasks, utilizing natural cover to the maximum. (3) Improvement of hasty fortification: (a) 1st Priority.— Camouflage to conceal the nature, extent, and location of the principal installations. Remaining squad trenches, simple standing type or slit trenches, on main line of resistance and in company and battalion re serve areas. Shallow connecting trenches. Obstacles protecting platoon positions. Strengthening and extending natural and artificial antimechanized obstacles. Permanent command posts, observation posts, and aid stations. (b) 2d Priority.— Squad trenches, simple standing type or slit trenches, in platoon and company positions on regimental reserve line. Comple tion of fire trenches and obstacles in company areas on main line of resistance. Strengthening and extending natural and artificial antimecha nized obstacles. Communication trenches from regimental reserve line to main line of resistance. (c) 3d Priority.— Completion of trenches and obstacles in the position. 281

Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.

Original scan

Loading the original scan…
Original scan, PDF page 286. Only this page is downloaded. Open the full PDF

FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data, PDF page 286

100%