ORGANIZATION QUARTERMASTER UNITS : (Continued) 32 I Unit QMCo (Gas Sup) QMBn (Gas Sup) QMCo (Dep-MT) QMSq(Rmt) QMCo(Dep) QMBn (Bkry) QMBn (Steriliza tion and hath) QMBn (Ldry) s T/0 No. 10-77 10-75 10-48 10-95 10-227 10-145 10-175 10-165 3 0 2 10 4 28 4 25 31 23 4 EM 117 480 300 718 148 654 663 1,196 6 Remarks 1 per type corps. Co H & Trk Plat. Distributes gas & oil and operates corps, army, or GHQ filling station. Capacity: 15,700 gallons gas & 300 gallons oil in 10 gallon cans. 1 per type army. Hq & Hq Det, 4 QM Cos (Gas Supply). Capacity: 62,800 gallons of gasoline and 1,200 gallons of oil, transported in 10-gallon cans. 9 mtcls; 9 trks, J^-tori, comd; 5 trks, H-ton, pick-up; 105 trks, 2J^-ton, cargo. Assigned as needed. Storage and issue of motor transport sup plies for first, second and third echelon maintenance of 3,000 vehicles. Tear-down and disposition of evacuated vehicles. A GHQ unit. Hq & Hq Det, 4 QM Trs (Rmt). Operates re mount depots with a combined capacity of 1,600 animals. Each troop is capable of operating separately up to a 400 animal capacity. 6 mtcls; 13 trks, IJ^-ton; 32 wagons, escort. 1 per type army. 2 per type air force. Furnishes enlisted spe cialists for technical supply operations of QM depots. Labor and transportation must be furnished from QM service units. Normal requirements for labor and trans portation: 1 QM company (truck) and 1 QM company (service). 1 mtcl; 1 trk, J/j-ton, pick-up; 3 trks, 2J^-ton. Normally established in the Com Z, but may be attached to army or corps. Bn Hq; 4 QM Cos (Bkry), each with 5-O and 158-EM. Supplies fresh bread. Capacity up to 96,000 men. Each company is capable of operating alone. Can be set up for operation within 3 to 4 hours and can furnish bread within 12 hours after being supplied. Has no transporta tion for movement. 6 mtcls; 1 trk, J^-ton, comd; 13 tries, IJ^-ton, cargo. A GHQ unit. Hq & Hq Det; 4 QM Cos (Sterilization & Bath). Conducts delousing, bathing and the issue of clean under wear. Operating capacity: 10,000 men per 10-hour day. Transportation requirements for movement: Bn, 48 trucks, 2J^-ton. Co: 12 trucks, 2J^-ton. Capable of separate oper- tion to include sections. (4 sections per Co). 5 mtcls; 7 trks, J^-ton; 25 trks, IJ^-ton, with trailers; 48 trailers, supply and sterilization and bath, 3-5 ton. Normally established in Com Z. Hq & Hq Det; 4 QM Cos (Ldry), with 4 Plats each. Operating capacity up to 160,000 men per week. Capable of decentralized operation by pla toons. Transportation for movement must be provided. 9 mtlcs; 6 trks, J^-ton; 21 trks, 1^-ton; 192 trailers, 5-9-ton, laundry. 75

Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.

Original scan

Loading the original scan…
Original scan, PDF page 80. Only this page is downloaded. Open the full PDF

FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data, PDF page 80

100%

Data on this page

13 data points

AttributeValue
QM Gas Supply Company
per type corps1 companies“1 per type corps. Co H & Trk Plat.”
QM Gas Supply filling station (corps)
gasoline capacity15700 gallons“15,700 gallons gas & 300 gallons oil”
oil capacity300 gallons“15,700 gallons gas & 300 gallons oil”
QM Gas Supply Battalion (army)
gasoline capacity62800 gallons“Capacity: 62,800 gallons of gasoline and 1,200 gallons of”
oil capacity1200 gallons“Capacity: 62,800 gallons of gasoline and 1,200 gallons of”
QM Depot Motor Transport Company
vehicles maintained3000 vehicles“first, second and third echelon maintenance of 3,000”
QM Remount Squadron
remount depot capacity1600 animals“combined capacity of 1,600 animals”
QM Depot Company
per type army1 company“1 per type army. 2 per type air force.”
per type air force2 companies“1 per type army. 2 per type air force.”
QM Bakery Battalion
bakery companies4 companies“4 QM Cos (Bkry)”
bread capacity96000 men“Capacity up to 96,000 men.”
set-up time4 hours (max of 3 to 4)“within 3 to 4 hours”
time to furnish bread after supply12 hours“within 12 hours”