Transcription
FIELD ENGINEERING DATA 193-194
Blade grader, 7^-ton—440 sq yds gravel road surface scar-
(self-propelled) ified and reshaped per hour.
—50 cu yds of loose rock or loose earth
spread per hour.
NOTE (1) Planks running lengthwise of road on each tread.
194. BRIDGE AND FERRYING EQUIPMENT.—a. Distribution of equipment.
1
Engineer Battalion, Combat,
Triangular Division
(T/O 5-75)............— ...........
Engineer Squadron, Cavalry
Division (T/O 5-115)..........
Engineer Regiment, Combat,
Square Division (T/O 5-11)
Engineer Regiment, Combat,
Corps (T/O 5-171)..............
Engineer Company, Bridge,
Armored Division
(T/O 5-215)
Engineer Company, Light
Ponton (T/O 5-85)..............
Engineer Battalion, Heavy
Ponton (T/O 5-275)............
2
Assault
boats
10
10
20
30
20
80
3
Ferry
•units (30-
ton)
2
4
Foot
bridge,
M-1938
(units
of
JtSS
feet)
1
2
6
Light
ponton
bridge
(10-ton),
M-1938
(units
of
850
feet)
3©
6
Heavy
ponton
bridge
(26-ton),
M-1940
(units
of
250
feet)
1
4®
7 8 9
Fixed bridges
Portable
steel
bridge,
H-10
capacity
® (feet)
72
Portable
steel
bridge,
H-SO
capacity
® (feet)
125
Portable
trestle
bridge
(feet)
300
NOTES
© Also stocked in Corps and Army depots.
© Will provide approximately 350 feet of reinforced bridge (20-ton capacity).
® Will provide approximately 430 feet of reinforced bridge (50-ton capacity).
275
Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.