197 FIELD ENGINEERING DATA c. Works (figures given are for daylight work; for work at night, in crease labor by 50%).— (1) Trenches.— (a) Work capacity of a platoon of three 12-man squads for eight hours, medium soil, with pioneer tools: (i) Simple standing trench (Figure 40), 120 linear yards. (ii) Standard fire trench, type A (Figure 40), 48 linear yards. (iii) Standard communication trench, type A, 60 linear yards. (b) In estimating for slit or other type trenches than the ab'ove, allow 15 cu. ft. per man hour, average soil, using pioneer tools. (2) Obstacles.— (a) Against personnel.—Single belt of double apron fence, 1000 yards long, requires approximately five (5) tons of materials and 380 man-hours of labor. Work capacity of 3-squad platoon in eight hours is approximately 750 linear yards of double apron fence, or 450 yards of high wire entanglement. (b) Against mechanized vehicles.— (i) Antitank mine field, 1000 yards long, mines laid directly from truck in 3-6 rows, density of l 1/^ mines per yard of front, requires: Number ________________———————1,500 mines Weight ________________________ 7% tons Man-hours (average) Daylight Night Mines laid on surface —————————————20 30 Mines laid and buried, soft soil _————_ 80 120 Mines laid and buried, medium soil ____100 150 Mines laid and buried, hard soil _——_——200 300 (ii) If trucks cannot reach and travel along the axis of the mine field, man-hours for carrying mines should be added at the following rates: in daylight, one man can carry 50 mines a distance of 100 yards in one hour ; at night one man can carry 25 mines a distance of 100 yards in one hour. (3) Clearing.—Four man-hours of labor for clearing 100 square yards of brush and a few trees up to 12-inches in diameter; if brush only, 2 man-hours. (4) Machine-gun emplacement.— Simple shell-hole type requires nine (9) man-hours of labor and 200 pounds of materials. d. Intrenching equipment.— Sets of intrenching equipment of pioneer tools are carried in 1-ton trailers by organic combat engineers as follows: Unit In infantry divisions (triangular) In infantry divisions (square) In each combat regiment (corps) In cavalry divisions No. of Sets 3 Inf 6 Inf 2 Inf 4 Cav No. of Trailers 612 4 6 Weight of cavalry set: 1,800 pounds; volume: 105 cubic feet. Weight of infantry set: 3,048 pounds; volume: 180 cubic feet. . 284

Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.

Original scan

Loading the original scan…
Original scan, PDF page 289. Only this page is downloaded. Open the full PDF

FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data, PDF page 289

100%

Data on this page

32 data points

AttributeValue
Platoon of three 12-man squads (pioneer tools, medium soil) simple standing trench
work capacity in eight hours120 linear yards“(i) Simple standing trench (Figure 40), 120 linear yards.”
Platoon of three 12-man squads, standard fire trench type A
work capacity in eight hours48 linear yards“(ii) Standard fire trench, type A (Figure 40), 48 linear yards.”
Platoon of three 12-man squads, standard communication trench type A
work capacity in eight hours60 linear yards“(iii) Standard communication trench, type A, 60 linear yards.”
Field works at night
labour increase over daylight50 percent“crease labor by 50%”
Slit or other trench types (average soil, pioneer tools)
excavation rate15 cu ft per man-hour“allow 15 cu. ft. per man hour, average soil, using pioneer tools.”
Single belt double apron fence (personnel obstacle)
length1000 yards“Single belt of double apron fence, 1000 yards long,”
materials required5 tons“requires approximately five (5) tons of materials”
labour required380 man-hours“and 380 man-hours of labor.”
Platoon of 3 squads, double apron fence
work capacity in eight hours750 linear yards“is approximately 750 linear yards of double apron fence, or 450 yards”
Platoon of 3 squads, high wire entanglement
work capacity in eight hours450 yards“is approximately 750 linear yards of double apron fence, or 450 yards”
Antitank mine field
length (example)1000 yards“Antitank mine field, 1000”
Antitank mine field (1000 yards long)
number of mines1500 mines“Number ________________———————1,500 mines”
weight of mines7 tons“Weight ________________________ 7% tons”
Antitank mine field, mines laid directly from truck
rows3-6 rows“mines laid directly from truck in 3-6 rows”
Mines laid on surface, 1000-yard field (table)
man-hours daylight20 man-hours“Mines laid on surface —————————————20 30”
man-hours night30 man-hours“Mines laid on surface —————————————20 30”
Mines laid and buried, soft soil, 1000-yard field (table)
man-hours daylight80 man-hours“Mines laid and buried, soft soil _————_ 80 120”
man-hours night120 man-hours“Mines laid and buried, soft soil _————_ 80 120”
Mines laid and buried, medium soil, 1000-yard field (table)
man-hours daylight100 man-hours“Mines laid and buried, medium soil ____100 150”
man-hours night150 man-hours“Mines laid and buried, medium soil ____100 150”
Mines laid and buried, hard soil, 1000-yard field (table)
man-hours daylight200 man-hours“Mines laid and buried, hard soil _——_——200 300”
man-hours night300 man-hours“Mines laid and buried, hard soil _——_——200 300”
Mine carrying by one man (when trucks cannot reach field)
carry rate daylight50 mines per 100 yards per hour“one man can carry 50 mines a distance of 100 yards in one hour”
carry rate night25 mines per 100 yards per hour“at night one man can carry 25 mines a distance of 100 yards in one hour.”
Clearing brush and trees up to 12 inches diameter
area cleared100 square yards“clearing 100 square”
Clearing brush only
labour2 man-hours per 100 square yards“2 man-hours.”
Machine-gun emplacement, simple shell-hole type
labour9 man-hours“(9) man-hours of labor and 200 pounds of materials.”
materials200 pounds“(9) man-hours of labor and 200 pounds of materials.”
Cavalry intrenching equipment set
weight1800 pounds“Weight of cavalry set: 1,800 pounds; volume: 105 cubic feet.”
volume105 cubic feet“Weight of cavalry set: 1,800 pounds; volume: 105 cubic feet.”
Infantry intrenching equipment set
weight3048 pounds“Weight of infantry set: 3,048 pounds; volume: 180 cubic feet.”
volume180 cubic feet“Weight of infantry set: 3,048 pounds; volume: 180 cubic feet.”