FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data (1941), p. 291

Page 291 of 363 in FM 101-10

Transcription

198 FIELD ENGINEERING DATA b. Description and use. 1 Obstacle Wire rolls Cables Improvised road blocks Abatis Demoli tions Post obstacles Road craters e 3 k Description Class Quick Quck Quick Semi- quick Semi- quick to delib erate Semi- quick to delib erate Semi- quick to delib erate Construction Issue item. Wire wound in spiral. Length extended — 40 feet. Effec tive against wheeled vehicles by entanglement Heavy wire Local vehicles, telephone poles, felled trees, furniture, rocks, demolished buildings, etc. Interlocking bands of felled trees or poles Destroyed culverts, bridges, build ings, etc. Logs, 9-10 feet long, 10-12 inches diameter; railroad rails; concrete blocks, etc., set vertically Blown by explo sives. Must block entire roadway Trans portation 75 rolls per l}£-ton truck 5 6 Use Method of installation Group of 4 rolls placed in contact, with first roll suspended by a wire, across road at places where encountered unex pectedly by vehicles; 30 to 50 yards be tween groups. Insert logs inside one or two rolls on ground, and place antitank mines in front of and within each group Several slack strand;! placed diagonally across road, so as to throw vehicle into ditch Heaped together. Stow with contact and antitank mines (arid persistent chemical, when authorized) Trees of 12-inch diameter or larger; tips toward enemy. Strew with contact mines (and persistent chemical, when authorized) Explosives, mechanical means, fire Ends protruding 2-3 feet. Multiple rows, staggered Minimum requirements : craters 20 feet wide, 8 feet deep, with side slopes made as steep as possible. Water makes passage more difficult _ Rate of installation Two men place 1 roll in 1 minute Few minutes only, using trees, buildings, etc., as anchorages Two men per tree in 15-45 minutes. Power equipment will accelerate rate of instal lation See PM 5-25, and FM 5-30. 100 men (hand tools) — 20 per hour. 8 men (power auger) — 15 per hour 1 squad (hand tools) per crater in 1-5 hours. Power augers desirable for drilling holes for explosive charges 286

Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.

Original scan

Loading the original scan…
Original scan, PDF page 291. Only this page is downloaded. Open the full PDF

FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data, PDF page 291

100%

Data on this page

12 data points

AttributeValue
Wire rolls (obstacle), group installation
spacing between groups30-50 yards“30 to 50 yards be”
rolls per group4 rolls“Group of 4 rolls placed”
Wire rolls (obstacle), installation
rate (two men)1 roll per minute“roll in 1 minute”
Wire rolls (obstacle), extended length
length40 feet“— 40 feet. Effec”
Abatis (felled tree obstacle)
minimum tree diameter12 inches“Trees of 12-inch”
Abatis (felled tree obstacle), installation
time per tree (two men)15-45 minutes“in 15-45 minutes.”
Post obstacles (logs or rails set vertically)
log length9-10 feet“Logs, 9-10 feet”
Post obstacles, installation
ends protruding2-3 feet“Ends protruding 2-3”
Post obstacles, installation (100 men hand tools)
rate20 per hour“20 per hour.”
Road craters (demolition obstacle)
minimum width20 feet“craters 20 feet wide,”
minimum depth8 feet“8 feet deep, with side”
Road craters, installation (1 squad hand tools)
time per crater1-5 hours“in 1-5 hours.”