Transcription
FIELD ENGINEERING DATA
&. Description and use.— (Continued):
198
1
Obstacle
Mine fields
Timber
obstacles
Inunda
tions
Antitank
ditch
Contami-
nationby
persist
ent
chemical
(only
when
specific-
cally author
ized by
appropri
ate com
mander)
2 3 k-
Description
Class
Semi-
quick to delib
erate
Deliberate
Deliberate
Deliberate
Quick to semi-
quick
Construction
3-6 longitudinal
rows, 1-3 yards
between rows.
Density of whole:
1J^ mines
per yard
Log or timber crib ;
saw-horse ramp;
log wall, etc.
Necessary depth
at least 3 feet
for wheeled
vehicles; at least
4 feet for light
and medium
tanks
4-6 feet deep.
8 feet wide for
light tanks; 12
feet wide for
medium tanks.
(For profile, see
figures 41, 42
and 43.)
Contaminate road
blocks, demoli
tions and obsta-
cales.
Contaminate roads
and areas as part
of a barrier
mission
Trans
portation
300 mines
per
IJ^-ton
truck
200 chemi
cal
mines
per
IJ^-ton
truck
5 6
Use
Method of
installation
Placed along fence lines,
in draws, brush, etc.
for concealment.
Reinforce natural
obstacle
Space between walls
filled with earth,
stones, etc. Fasten
timbers with drift-
pins, cables, etc.
Construction of dams;
cutting existing dams,
levees or dikes;
diversion of streams
Triangular or
trapezoidal type
ditch, concealed by
trees, brush, or
ground folds
1 or more mines per
obstacle. 200 mines
per mile of road.
Airplane spray:
average area covered
by one airplane —
800 yards long,
300 yards wide
Rate of
installation
Maximum overall
laying rate di-
directly from
trucks (carrying
and burying in
medium soil)
about 15 mines
per man-hour
(Also see para
graph 197 c (2)
(b).]
See FM 5-30.
100 feet of triangu
lar ditch: 32 men
(hand tools) —
5^2 hours in
average soil
Road contamina
tion: 8 men —
1 to 2 hours per
mile (day) ;
\ l/l to 3 hours
per mile (night)
287
Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.