FIELD ENGINEERING DATA &. Description and use.— (Continued): 198 1 Obstacle Mine fields Timber obstacles Inunda tions Antitank ditch Contami- nationby persist ent chemical (only when specific- cally author ized by appropri ate com mander) 2 3 k- Description Class Semi- quick to delib erate Deliberate Deliberate Deliberate Quick to semi- quick Construction 3-6 longitudinal rows, 1-3 yards between rows. Density of whole: 1J^ mines per yard Log or timber crib ; saw-horse ramp; log wall, etc. Necessary depth at least 3 feet for wheeled vehicles; at least 4 feet for light and medium tanks 4-6 feet deep. 8 feet wide for light tanks; 12 feet wide for medium tanks. (For profile, see figures 41, 42 and 43.) Contaminate road blocks, demoli tions and obsta- cales. Contaminate roads and areas as part of a barrier mission Trans portation 300 mines per IJ^-ton truck 200 chemi cal mines per IJ^-ton truck 5 6 Use Method of installation Placed along fence lines, in draws, brush, etc. for concealment. Reinforce natural obstacle Space between walls filled with earth, stones, etc. Fasten timbers with drift- pins, cables, etc. Construction of dams; cutting existing dams, levees or dikes; diversion of streams Triangular or trapezoidal type ditch, concealed by trees, brush, or ground folds 1 or more mines per obstacle. 200 mines per mile of road. Airplane spray: average area covered by one airplane — 800 yards long, 300 yards wide Rate of installation Maximum overall laying rate di- directly from trucks (carrying and burying in medium soil) about 15 mines per man-hour (Also see para graph 197 c (2) (b).] See FM 5-30. 100 feet of triangu lar ditch: 32 men (hand tools) — 5^2 hours in average soil Road contamina tion: 8 men — 1 to 2 hours per mile (day) ; \ l/l to 3 hours per mile (night) 287

Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.

Original scan

Loading the original scan…
Original scan, PDF page 292. Only this page is downloaded. Open the full PDF

FM 101-10 Staff Officers Field Manual Organization Technical Logistical Data, PDF page 292

100%

Data on this page

13 data points

AttributeValue
Mine fields (obstacle)
mines per obstacle (minimum)1 mine per obstacle“1 or more mines per”
Mine fields (obstacle), road use
mines per mile of road200 mines per mile of road“200 mines per mile of road.”
Mine fields (obstacle), laying rate
maximum overall laying rate15 mines per man-hour“about 15 mines”
Airplane spray of mines
area length covered by one airplane800 yards“800 yards long,”
area width covered by one airplane300 yards“300 yards wide”
Inundation obstacle (wheeled vehicles)
necessary depth3 feet“at least 3 feet for wheeled”
Inundation obstacle (light and medium tanks)
necessary depth4 feet“at least 4 feet for light and medium tanks”
Antitank ditch
depth4-6 feet“4-6 feet deep.”
width for light tanks8 feet“8 feet wide for”
width for medium tanks12 feet“light tanks; 12”
Antitank ditch (100 feet of ditch)
labour (32 men hand tools)32 men“lar ditch: 32 men”
length basis100 feet“100 feet of triangu”
Road contamination (persistent chemical, authorized only)
labour time per mile (day)1-2 hours per mile“1 to 2 hours per mile (day)”