Transcription
GERMAN INFANTRY WEAPONS
(2) Preparation for action.-(a) Set the base plate
and bed it into the ground; set the ball-shaped section
of the breech cap of the tube into the base-plate socket,
with the flat section to the side. Turn the tube in
the socket until the spring-actuated bolt is on top;
spread the bipod legs, put the bipod in position with
the elevating handwheel toward the tube, and see that
the line formed by the bipod legs is parallel to the
line formed by the forward edge of the base plate; open
the mortar barrel clamp and set the elevation so that
one-third of the elevating screw shows above its tube,
and then place the barrel inside the clamp between
the position marks on the barrel itself; place the sight
on the sight base, tighten the mortar tube clamp, and
set the sight to 1200; lay the mortar roughly by mov-
ing the bipod legs and then set the legs by pressing
the spikes into the ground.
(3) Elevation.-Check the firing table (see table 3,
p. 110, below) for the elevation necessary for the range
and charge that you are using, and adjust the sight
accordingly. Set the elevation clinometer by moving
the elevating crank.
(4) To zero mortar.-Sight the upper part of the
sight on your aiming point or stake, and lay the mortar
for direction by using the deflection adjustment on the
sight. Note the angle shown on the deflection scale
of the sight.
(5) Determination of direction of fire.-Set up all
aiming stake or select an aiming point in line with
the target (see fig. 57). . With the deflection scale on
the sight at zero degrees if the aiming point or stake is
106
Uncorrected OCR text. Columns and tables may be out of order; the scan is the authority.